Äâà áóðîâûõ êîìïëåêñà â Ìàå.December 29, 2006Made in Canada.
We are pleased to quote on your requirements as follows;MAST, SUBSTRUCTURE, AND DRAWWORKSMast
- Fabricate and supply 105’ telescopic mast of square tubing construction, maximum 375,000 lb hook load with eight part line.
- Fabricate and supply pipe racking board c/w sheeting. Install 12 ga. sheeting in top section of mast at the racking board location - 4200 meters of 4” pipe.
- Install ladder the full length of the mast on the drillers side.
- Fabricate and install water table frame and crown walkaround c/w handrail. Crown sheaves, shafts, bearings, pedestals, etc., are included.
- Supply and install tong counterweights and tie back lugs. Sheaves for counterweights are to be included.
- Supply and install sheaves and latching mechanism for extending the top section of the mast. - -- Supply and install bridle lines to extend top section.
- Supply drilling line anchor.
- Install pan to support load block during transport.
- Install roller blocks for making and breaking the pipe joints.
- Racking board to hold a minimum of 4,200 metres of 4” pipe.
- Supply and install 4” standpipe and 2” circulating line.
- Extend the mast ladder an additional 3’ beyond the bottom section and install platforms complete with fixed handrails on both sides of the mast.
- Install Geronimo post on the off drillers side of the mast.
- Fabricate and install removable ladder on the bottom section of the mast to provide clearance for driller’s console. Mount the weight indicator.
- Supply and install lugs for the top drive unit in the top section of the mast. Add top drive beam. - Install cover over lug for future use when drive is installed.
- Supply and install a folding casing stabbing board.
- Weld ½” diameter collars in the bottom of the mast for drainage.
- Install lug brace in the bottom section of the mast to hand the block.
- Fabricate and install easy rider post in the crown frame, complete with greaseable pins.
- Fabricate and install pedestals and plates to mount two PL-8 tugger winches on the back of the mast and the survey winch.
- Supply and install 12 ga. sheeting on 3 sides of the monkey board frame.
- Supply and install lugs on monkey board for top drive.
- Supply and install all safety cable lugs.
- Supply and install pads to cover fingers on monkey board.
- Supply and install top drive (Victory 350)
Substructure
- Supply and fabricate one step down substructure being 14’4” wide with a drilling floor height of 15’ 0”. Table rating of 375,000 lbs.
- Supply and install 17 ½” rotary table.
- Supply 12 ga. wall panels complete with double doors and tarp rods to enclose the cellar under the drilling floor.
- Cross brake and counter sink wall panels.
- Install bird bath and checker plate flooring on the drilling floor.
- Supply access stairs on each side of the sub structure from the drawworks deck to the drilling floor, complete with handrail, both sides.
- Supply 3’ 6” handrail around the drilling floor and drawworks as required.
- Fabricate and install lugs at the well centre to secure snatch blocks for pulling the drawworks skid onto the substructure.
- Install and supply four sheaves complete with side plates and removable pins for the 2 tugger winches at the water table frame.
- Supply and install alligator pipe racking in the bird bath. Supply and install bird bath cover panel covers fabricated from Perfo grip.
- Install brackets for light fixtures under the stairs. Install openings for the water and steam lines in the panels.
- Fabricate and install two snubbing posts on the drilling floor, each side of the V-door opening.
- Install 1 ¼” x 3/16” bar grating in the drilling floor.
- Fabricate marker tube for well centre. Fabricate removable ladder to access the loading skid in the cellar.
- Install shelf to mount hydraulic valve bodies in the cellar. Fit and weld brackets for the hydraulic lines.
- Install pipe in sub skid to pin pontoons to sub.
- Supply and fabricate lifting plat for the 9” diameter x 3,000 lb. BOB stack.
- Supply and install skidding lugs on sub.
- Box both sides of rotary table beams with ½” plate.
- Box main table beam with ½” plate.
- Supply and install two only 5 x 5 x ½” tubing under the rotary table.
- Two outriggers on loading skid to accommodate 5” upright tubing.
- Fabricate and install drain pipe for Kelly hose in the drilling floor. The drain in plumbed out the side of the substructure to the mud tank.
- Supply and install BOP carrier, track, and rollers in the cellar.
- Supply and install mudline in sub.
- Supply and install leveling jacks.
Drawworks
- Supply and fabricate skid to unitize the motor, drawworks, and mast in one unit for shipping.
- Supply and install TSM 850 hp drawworks.
- Supply and install elevated drive.
- Supply and install Waterous 60 Series floor motor c/w 6061
16” Fawick clutch
- Supply and fabricate mast base and crown stand for the mast.
- Supply and install taper on skid, complete with dowels and tie down lugs.DOGHOUSE/WATERTANKDoghouse
- Supply and fabricate the basic overall structure being 23’ 8 ½” long x 8’ 9 3/16” high x 9’ 4” wide
- Hydraulic slide out
- Standard cross broken panels
- Two single doors with windows
- Work bench
- Sitting bench
- Tool rack
- One set of cabinets
- Ladder on one end
- Tool/junk shack on other end
- Two single doors and windowsWater tank
- Supply and fabricate the basic overall structure being 41’ 6” long x 11’ 4” wide x 8’ 0” high
- Standard cross broken panels
-30” stairs along the water tank side
- 32” wide stairs going up to the doghouse
- 4’ 0” fuel tank
- Glycol tank
- One single door
- Two ladders
- Two fuel pumps
- One water pumpMud Tank
- Supply and fabricate the basic overall structure being 55’ 6” long x 11’ 9” wide x 8’ 0” high
- Mixing house, 10’ 0” long
- Suction tank 11’ 8” long
- Pre-mix settling tank 11’ 1” long
- Shaker tank 14’ 9” long
- Trip tank 2’ 6” long
Mixing House
- Three pump system
- Mixing hopper (venture style) with the dust collector
- One set of double doors
- One single door on the side
- 24” wide stairs
- 30” degasser hard plumbedTank
- 1/4” crimped plate
- Two 7 ½ hp agitators
- Pill tank inside the suction tank
- 4” clean out vacuums
- Two skimmers
- Three 3” mud guns
- One sand trap
- Supply and install two only Brandt King Cobra shale shakers
- Hole fill pump in the trip tank
- 30” wide stairs on the end of the building to flip up when traveling
- Flip up walkway around the shakers
- Welded on handrails
- One single door on the end wallMud tank skid
- 1’ 6” landing on both sides
- Four W12 x 40 skid beams
- 4” drill pipe running through the skid beams
- 2” drop on the mixing end
- Sloped flooring
- Checker plate flooring
- 3/8” plate customized outriggerVolume
- Suction tank 167.4 bbls
- Pre-mix settling tank 158.6 bbls
- Shaker tank 211.7 bbls
- Gross volume 537.7
- Supply and install electrical components
- Sandblast, prime and paint in Endura, to customer’s coloursCOMBINATION BUILDINGSupply and fabricate one combination building 11’ 0” wide x 50’ 0” long. Supply and install the following items: two generator sets (one only V12 2000 genset, one only 60 series genset or two series 60 4 litre generators), electrical, accumulator, storage cabinets, lockers in the change room, fuel tank, air tank and associated lines.
PUMP HOUSESSupply and fabricate two pump houses 12’ 4” wide x 36’ 0” long. Supply and install Waterous Detroit diesel V12 2000, F1000 triplex mud pump, all piping and fittings, day tank and electrical.BOILER BUILDINGSupply and fabricate one boiler building, 12’ 4” wide x 40’ 0” long complete with water tank and fuel tank. Supply and install 125 hp boiler, all wiring and plumbing.PUSHSHACKSupply one fully equipped tool push shack
(Allowance of $95,000.00)CATWALK, PIPETUBS AND PIPE RACKSCatwalk – powered
55’ 8” long x 10’ 6” wide x 3’ 6” high
Manifold house 9’ 0” long x 4’ 0” wide x 8’ 0” high
- Paneled walls
- Standard cross broken panels
- Two single doors
- 5”x 3” x .250 tubing roof side runners
- 3” x 3” x .188” tubing corner posts
- Supply and install manifold
- Plate roofCatwalk skid
- Two beams W8 x 31
- 1’ 6” landing on the manifold end
- W6 x 20 beam running through the skid beams
- Checker plate flooring
- Flat bar to box the full length of skid
- 30” wide stairs on manifold endPipe tubs (5 only)
- Supply and fabricate the basic overall structure
- One pipe tub being hydraulic and four forklift accessible pipe tubs
- 6” x 4” x .250” tubing as the main posts
- 4” x 4” x .250” tubing for the bracing
- Skid to be 35’ long
- 1’ 6” landing on each end
- Three W10 x 33 skid beams
- Seven W6 x 20 beams running through the three skid beams
- Checker plate flooring
Pipe Racks
- Supply two pipe racks being 40’ long and 42” highRIG UP – in cooperation with the supplier. TOTAL PROJECT COST: $12,500,000.00 US FUNDS
Please note that pricing is subject to change to include any incurred increase in costs of materials, components, and labour subsequent to the date of this quote.This quote is valid for 10 days.GST is in addition to the above pricing. Crating, Freight is not included in this price. Any applicable taxes, duty or brokerage are also not included.BOP’s and pipe will be extra.Should you require anything further, please do not hesitate to call.Yours truly,Val Tsupko
email: valtsupko@hotmail.com
tel:(403) 681-8392

Val Tsupko
Ñâÿçàòüñÿ: Îòïðàâèòü ïèñüìî
Òèï: Ïðåäëîæåíèå
Ãîðîä: Ìîñêâà
Àêòóàëüíîñòü: 80% (çàÿâëåíî íà óäàëåíèå)
Îáðàòèòå âíèìàíèå:
- Êîâàíûå ðåøåòêè, ñâàðíûå ðåøåòêè, ïåðèëà, îãðàäû..
- ìÿñî êóðû è èíäåéêè.
- Ïîìîãó îðãàíèçîâàòü áåçíàëîãîâûé áèçíåñ ÷åðåç Îáúåäèíåííûå À
- Îáîðóäîâàíèå â Ëèçèíã. Ñíà÷àëà ïîëüçóéòåñü, çàòåì ïëàòèòå..
- êóïëþ êóêóðóçó.
- Ïðîäàåì ÄÏÌ20-Í1-02, ÄÏÐ25-í3-01, ÄÏÐ25-í3-02ã, äïð42-í1-02.
- ïðîäàæà êèòàéñêèé ïîäøèïíèê.
- Íåôòåïðîäóêòû, ÃÑÌ, íåôòü, ãàç íà M-100.ru.
- äåâ÷åíêà, äåâ÷îíêè, äåâ÷îíêè ôîòî, äåâî÷êè, ôîòî äåâî÷åê, òå
- Îáîðóäîâàíèå.
- Àíòèâèðóñ â ïîäàðîê - Íîàîãîäíÿÿ Àêöèÿ!.
- óòåïëåíèå áàëêîíîâ.
- Ðåìîíò íîóòáóêîâ - Ñåðâèñ-Öåíòð ïî ðåìîíòó íîóòáóêîâ.
- Papinbag.ru. Ïîäàðêè íà êðåñòèíû.
- Êóïèì ÄÀÇÎ 630/1500.
- Ôîòî, êëèïû, âèäåî äëÿ âçðîñëûõ íà freegirls.ru.
- Àðåíäà ìèíèïîãðóç÷èêîâ Bobcat S-175.
- Êîìïðåññîð 2ÂÌ2,5-14/9 2ÂÌ2,5-14 9 2ÂÌ2,5-14-9.
Îáúÿâëåíèå: âûâîç ìóñîðà www.glavpromstroy.ru